Leave a Message

Thank you for your message. We will be in touch with you shortly.

Blog

The Glen Ridge Jitney's Real Deadline Isn't December. It's This Month.

Ask a Glen Ridge commuter what happened to the jitney and most will tell you a version of the same story: the borough almost killed it back in the winter, residents packed a council meeting, and the service got a reprieve. Case closed, ride on.

That's the story that gets told. It isn't the whole story. The reprieve that kept the North End Jitney and South End Jitney running to Ridgewood Avenue Station wasn't a decision to save the program. It was a decision to buy time for a different one. The Borough of Glen Ridge is currently running a formal Request for Proposals for the "design, implementation, and operation" of a new microtransit jitney program, and the bid window on that RFP closes September 24, 2026. That's the actual deadline. December 31 is just the date the current arrangement runs out if nothing new is in place by then.

If you ride the jitney, or you're weighing whether to count on it this winter, the difference between those two dates matters more than the headline from January.

What Actually Happened Last Winter

The trouble surfaced on December 30, 2025, when the borough posted that jitney tickets would stop being sold for any service beyond March 31. The reasoning: ridership had never recovered to more than 40 percent of its pre-pandemic volume, one of the borough's drivers was retiring, and the fleet needed another bus soon. Officials framed it as a program under review, not a program ending, but residents heard the second part louder than the first.

A public meeting on January 5, 2026 drew a crowd large enough that the borough followed up with a second town hall on January 29 at Borough Hall, this one billed as a presentation on the jitney's history and the options going forward. Residents proposed real-time bus tracking, electronic passes, and extending routes to cover student commutes to and from school. None of that has been implemented yet. What did happen is that the March 31 cutoff quietly disappeared. The borough's current jitney page now states the program will continue in its current format, unchanged routes and schedules, through December 31.

That's an extension, not a resolution. The RFP closing this month is where the resolution actually gets decided.

The Math Nobody Wanted to Say Out Loud

Here's the number that explains why this became a crisis instead of a routine budget line. In 2025, the jitney brought in about $27,500 in fare revenue. It cost the borough roughly $293,000 to run, capital and operations combined. Divide the difference across actual rides and you get a subsidy of more than $8 per trip, paid by the borough, every time someone steps onto either shuttle.

That's not a new problem caused by inflation or a bad budget year. It's the same math the jitney has run on for over a decade, just hidden until ridership fell far enough to make it visible. For years, higher pre-pandemic ridership kept the per-ride subsidy small enough that nobody had to talk about it out loud. Once ridership settled at roughly 40 percent of its old volume and a driver's retirement forced a fleet decision, the borough couldn't keep spreading a fixed cost across a shrinking rider base without the number becoming impossible to ignore.

Why the Jitney Exists at All

The origin story matters here, because it explains why Glen Ridge has a subsidized shuttle in the first place while most towns its size don't. When the Montclair Connection opened in 2002, NJ Transit closed the Benson Street station, a stop that had served the borough's residential south side since the 1880s. In exchange, NJ Transit subsidized a replacement shuttle service to get displaced riders to the surviving Glen Ridge station on Ridgewood Avenue. That funding lasted until 2011, at which point it ended and the borough started charging fares for the first time.

Since 2011, Glen Ridge has been quietly absorbing the cost of a service it inherited as compensation for losing a train stop. That's a fifteen-year run of local subsidy that never had to justify itself until now, because ridership was strong enough to keep the gap small. The RFP closing September 24 is the first time in the jitney's history that the borough is asking outside vendors to redesign the whole model rather than just patch the existing one.

How Glen Ridge Compares to Its Neighbors

Part of what's made this debate loud is that Glen Ridge isn't operating in isolation. Neighboring towns run versions of the same service on very different terms.

Town How riders pay Current status
Glen Ridge Monthly pass or 10-ride ticket packs, no free option Unchanged through Dec. 31 while a redesign RFP is under review
West Orange Free to residents Established, ongoing service
Maplewood $3 per ride, or $165 for an annual pass Established, ongoing service
Montclair No jitney currently operating In early planning; a Local Shuttle Transportation Committee is studying routes and costs, with a possible 2027 launch

West Orange's free model and Maplewood's flat-fee model both still require a town to eat the operating gap, they just choose to make that gap invisible to riders rather than passing more of it through fares. Montclair, meanwhile, is watching Glen Ridge's experience closely as it studies bringing back its own commuter shuttle. A township survey drew more than 2,000 responses, roughly 5 percent of Montclair's population, and found close to nine in ten respondents said they'd likely use a shuttle if one launched. Montclair's own timeline treats 2026 as a planning year, with a possible 2027 launch and performance review in 2028.

That comparison matters for Glen Ridge because it shows there's no single obvious fix waiting to be copied. Going free like West Orange increases the subsidy per ride. Matching Maplewood's flat fare doesn't close a gap this size on its own. Whatever comes out of the current RFP process will have to be a genuinely different structure, not just a price change.

What This Means If You Ride It This Fall

For now, the practical answer is simple. Routes, schedule, and pricing are unchanged through the end of the year. The evening shuttles still run their existing loop from Ridgewood Avenue Station, waiting for the train before dropping riders at their usual stops. If you're a regular rider, this fall looks exactly like last fall.

What's different is that the decision about next year is being made right now, not in some distant future council session. The RFP responses close September 24. Whatever proposal the borough selects, if it selects one, will shape what riders see when the current arrangement expires December 31. If you have opinions about routes, fare structure, or whether the service should expand to cover students, this is the window when that input has somewhere to go, not after a new contract is already signed.

Glen Ridge's gaslit streets and walkable blocks are part of what makes the borough feel distinct from its larger neighbors, and for many families, a reliable link to the train has been part of that same package. Whether that link survives in its current form, or gets rebuilt into something else entirely, is being decided this month, not next winter.

If you're thinking about what any of this means for a home search in Glen Ridge, or you're weighing how a town's transit decisions affect day-to-day life here versus in Montclair, Maplewood, or West Orange, that's exactly the kind of on-the-ground context The Home Collective tracks for buyers and sellers across Essex County. Reach out and we'll walk you through what's actually happening in the towns you're considering, not just what the listing photos show.

Work With Us

Our expansive network and white-glove service ensure a bespoke experience for both buyers and sellers.
Contact Us
Follow Us